November 27, 2026
Strategy Execution in Manufacturing: Why Good Strategies Fail and How OKRs Can Help
A manufacturing company completes all five planned SMED workshops, yet its average changeover time remains at 38 minutes instead of the targeted 25. The project plan shows that every activity has been completed, but the expected operational improvement has not materialised. Should management consider the initiative successful?
This example illustrates one of the fundamental challenges of strategy execution: organisations can be highly effective at completing planned activities without achieving their strategic objectives.
Management teams invest considerable time in developing strategies, defining priorities and preparing action plans. However, once they return to daily operations, customer requirements, production delays, staffing shortages and quality issues compete for management attention. Without a structured management process that connects strategic priorities with operational performance, even well-defined objectives can gradually lose their importance.
The challenge is not simply to implement the strategy as originally planned, but to continuously evaluate whether its implementation is producing the expected results.
Why Does Strategy Execution Fail?
Strategy execution is the management process of translating strategic priorities into measurable objectives, coordinated activities and operational results, while adapting decisions based on actual performance.
Effective execution requires coordination across organisational functions as well as the ability to adapt plans when circumstances change. Research published in Harvard Business Review has highlighted both issues as important challenges in implementing strategy.
In manufacturing, these challenges become particularly apparent because achieving a strategic objective rarely depends on a single department. Improving production efficiency, for example, may require coordinated contributions from production, maintenance, quality, engineering and logistics. Each department may successfully complete its assigned activities, while the overall performance improvement remains below expectations.
Three common weaknesses in strategy execution are:
- Strategic objectives are not translated into clearly defined, measurable outcomes.
- Departments manage activities without sufficient visibility of their contribution to shared objectives.
- Management reviews focus on activity completion rather than the effectiveness of those activities.
OKR – Objectives and Key Results – provides a practical framework for addressing these challenges.
How OKRs Support Strategy Execution
OKR is a goal-setting and management framework that connects qualitative objectives with measurable outcomes within a defined period. An Objective describes what an organisation wants to achieve, while its associated Key Results define the measurable evidence of success.
A study published in the Journal of Business Research in 2026 highlights how OKRs can support middle managers in interpreting strategic priorities, communicating them across organisational levels and coordinating their implementation.
This is particularly relevant in manufacturing companies, where middle managers play a critical role in translating strategic decisions into operational improvements.
Consider the following illustrative OKR for a manufacturing company.
Objective: Improve production efficiency
Key Results to be achieved by the end of Q2:
- Increase Overall Equipment Effectiveness (OEE) from 70% to 85%.
- Reduce average changeover time from 40 to 25 minutes.
- Reduce scrap rate from 3% to 1.5%.
The Objective establishes the direction, while the Key Results define the expected improvement and the timeframe in which it should be achieved.
Only after these outcomes have been defined should management determine which initiatives, activities and resources are needed. The selected activities represent the team’s current understanding of how to achieve the desired results. Their effectiveness must subsequently be evaluated against actual performance.
OKRs vs KPIs: Understanding the Difference
One of the most common questions when implementing OKRs is how they relate to existing Key Performance Indicators (KPIs).
KPIs measure performance, while Key Results define the measurable outcomes an organisation intends to achieve within a specified period. A Key Result may use an existing KPI as its measure without requiring the introduction of a new indicator.
Research published in IEEE Engineering Management Review in 2025 discusses how combining KPIs and OKRs can help organisations manage ongoing performance while pursuing strategic change.
In a manufacturing environment, the relationship can be illustrated as follows:
| Management element | Purpose | Manufacturing example |
|---|---|---|
| Objective | Defines what we want to achieve | Improve production efficiency |
| Key Result | Defines the expected measurable outcome | Increase OEE from 70% to 85% by the end of Q2 |
| KPI | Measures actual performance | OEE (%) |
| Activity | Defines an intervention intended to improve performance | Implement targeted SMED improvements |
| Task | Specifies a concrete action | Analyse internal and external changeover activities |
A KPI such as OEE may be monitored continuously for several years. A Key Result, however, defines a specific improvement in OEE within an agreed period. Once the target has been achieved, OEE remains an important operational KPI, even if the organisation establishes different strategic objectives.
Not every KPI needs to become a Key Result. Organisations should select Key Results that reflect their current strategic priorities while continuing to monitor other indicators essential for stable operations.
For example, an initiative to improve OEE should not compromise safety, product quality or delivery performance. These indicators remain important even when they are not included in a particular OKR.

Why Completing Activities Does Not Guarantee Results
Let us return to the manufacturing example and assume that the management team reviews its OKR at the end of Q2.
| Key Result | Baseline | Target | Actual | Progress towards target |
|---|---|---|---|---|
| OEE | 70% | 85% | 76% | 40% |
| Average changeover time | 40 min | 25 min | 38 min | 13% |
| Scrap rate | 3% | 1.5% | 2.4% | 40% |
Illustrative example. Progress represents the improvement achieved relative to the planned improvement from baseline to target.
During the same period, all five planned SMED workshops were completed.
From a project management perspective, the workshops have been delivered as planned. From a performance management perspective, however, only approximately 13% of the targeted reduction in changeover time has been achieved.
This distinction is essential. A completed activity is an output; an improvement in operational performance is an outcome. Both are important, but they provide fundamentally different information to management.
The result does not automatically mean that the workshops were ineffective. Improvements may not yet have been fully implemented, other constraints may be limiting performance, or the observation period may be insufficient. However, workshop completion alone does not provide evidence that the expected improvement has been achieved.
This is why management must review activities together with the performance indicators they are intended to influence.
What Should Management Do When Key Results Are Not Achieved?
A deviation from a Key Result should initiate a management discussion rather than simply result in a red status indicator on a dashboard.
In the changeover example, scheduling additional SMED workshops without understanding why the expected improvement has not materialised may consume further resources without addressing the actual problem.
A more effective management review would examine four areas:
- Measurement reliability: Are changeover times measured consistently and under comparable conditions?
- Implementation: Have the improvements identified during the SMED workshops actually been introduced into the production process?
- Effectiveness: Which changes have produced measurable improvements, and which have not?
- Remaining constraints: What continues to prevent the team from achieving the target?
Depending on the findings, management can adjust existing activities, introduce additional actions, initiate systematic problem-solving or reconsider the assumptions on which the original plan was based.
This approach follows the logic of the PDCA cycle – Plan, Do, Check, Act. The Check phase evaluates actual performance against expected results, while the Act phase translates the findings into appropriate management decisions.
Without these two phases, strategy execution risks becoming little more than action plan administration.
Connecting Strategy Execution with Daily Management
Strategic objectives should not be managed independently of the operational processes that influence their achievement.
In manufacturing, many of the indicators used to evaluate strategic progress originate in daily operations: equipment availability, production output, scrap, downtime, changeover time and delivery performance. If these indicators are already monitored through Daily Management routines, they can provide valuable information for OKR reviews.
The frequency of management reviews should reflect the nature of the indicator and the speed at which corrective decisions are required.
| Management level | Typical review frequency | Management focus |
|---|---|---|
| Operational management | Daily or per shift | Operational deviations, immediate actions and process stability |
| Departmental management | Weekly | Performance trends, improvement activities and cross-functional challenges |
| Strategic management | Monthly or quarterly | Key Result progress, strategic priorities, resource allocation and management decisions |
Illustrative management review structure. Frequencies should be adapted to the organisation and its processes.
Research also supports the importance of regular progress monitoring. A meta-analysis published in Psychological Bulletin, covering 138 experimental studies and 19,951 participants, found that interventions encouraging progress monitoring improved goal attainment. The effects were stronger when progress was recorded or communicated to others.
Although this research was not specific to manufacturing or OKRs, it supports an important management principle: objectives are more useful when progress is actively monitored and made visible.
The purpose of these management routines is not to create additional meetings or reporting requirements, but to ensure that information from daily operations supports decisions at the appropriate organisational level.
How Performance Storyboard® PMB Supports Strategy Execution
As organisations grow, maintaining the connection between strategic objectives, KPIs, improvement activities and individual responsibilities becomes increasingly complex. Information is often distributed across presentations, spreadsheets, project plans, meeting minutes and operational reporting systems.
This fragmentation makes it difficult to determine whether individual activities are contributing to strategic objectives, particularly when several departments are involved.
PMB – Performance Management Board, part of the Performance Storyboard® platform, was developed to address this challenge by connecting the key elements of performance management within one digital environment:
Strategic priorities → Objectives → Key Results → KPIs → Activities and tasks → Performance review and management decisions
Within PMB, managers can monitor progress towards objectives, review KPI trends, track activities and responsibilities, and identify deviations from expected performance. The connection between objectives and activities also provides a clearer overview of why individual improvement initiatives were introduced.
Returning to the SMED example, management can review the development of actual changeover times alongside the associated improvement activities. If the expected results are not achieved, the team has a structured basis for discussing deviations and defining further actions.
This also supports collaboration across organisational levels. Production, maintenance and engineering teams can understand how their respective activities contribute to shared objectives, rather than managing improvement initiatives in isolation.
A connected digital management environment can reduce the need to manually consolidate information from multiple sources, provided that performance data and activities are kept up to date. Management meetings can then devote more time to analysing performance, understanding deviations and making decisions.

What Makes OKR Implementation Effective?
Neither OKRs nor digital management systems can compensate for unclear strategic priorities, unreliable performance data or inconsistent management practices.
For OKRs to support effective strategy execution, organisations should establish a few fundamental management principles:
- Define a limited number of meaningful objectives with measurable, time-bound Key Results.
- Assign clear ownership and ensure that teams understand their contribution.
- Establish reliable measurement methods and baselines before evaluating progress.
- Regularly review actual performance alongside planned improvement activities.
- Adapt activities and allocate resources according to evidence, rather than continuing with an ineffective plan.
It is also important to recognise the limitations of current research. A 2024 systematic mapping study identified 47 academic studies on OKRs but found that the framework remains insufficiently documented from a theoretical perspective. OKRs should therefore be treated as a management framework whose effectiveness depends on implementation, rather than as a guaranteed solution to strategy execution challenges.
From Strategic Objectives to Measurable Results
Effective strategy execution depends on an organisation’s ability to understand the relationship between its strategic priorities, operational performance and improvement activities, and to respond when the expected results are not achieved.
Combined with KPIs, Daily Management and PDCA, OKRs provide a practical framework for maintaining this connection. Performance Storyboard® PMB supports the process by bringing objectives, performance indicators, activities and responsibilities together within a structured digital management environment.
At the next management review, consider evaluating planned activities alongside the measurable improvement they were intended to deliver. This comparison can reveal where management attention and resources are most urgently needed.
The success of strategy execution should be measured by the results achieved, not by the number of activities completed.
Would You Like to Improve Strategy Execution in Your Organisation?
Discover how Performance Storyboard® – PMB modul – connects strategic objectives, Key Results, KPIs and daily management activities in practice.
Contact us to arrange a free demonstration or trial of PMB.
References and Further Reading
- Sull, D., Homkes, R. & Sull, C. (2015). Why Strategy Execution Unravels—and What to Do About It. Harvard Business Review.
- Wowerath, C. (2026). Objectives and key results as a tool for middle managers to enhance the process of strategy implementation. Journal of Business Research, 202.
- Cunha, M. P. E., Parreira, R., Giustiniano, L. & Rego, A. (2025). The KPI-OKR System: Articulating the Paradoxical Tensions of Strategy and Execution. IEEE Engineering Management Review, 53(6), 62–79.
- Silva, R. & Santos, G. (2024). Surveying the Academic Literature on the Use of OKR (Objectives and Key Results) – An Update. ISys – Brazilian Journal of Information Systems.